Room planning

Plan an MRI room from your own drawing: the 5-gauss line, the helium vent and every check.

Learning

Four technical courses with 3D models and narration.

Advisor

Ask a question. The answer comes only from the library, with its sources.

Quotations

Ask the manufacturer's verified sales team for a quotation.

Plans

Plans for buyers, sales teams, learners and institutions.

Biomedical Intelligence

Scroll

FROM PHYSICS TO PATIENT

Choose the scanner. Plan the room. Train the team.

Independent CT and MRI evidence for the people who choose, sell and service imaging systems.

The problem

Choose, build, run: each step goes wrong.

  1. Choose

    0 of 9

    CT and MRI business cases met the auditor's criteria in Victoria, Australia. Seven set no target for use.

    SourceVictorian Auditor-General's Office, 2015

  2. Build

    $2.44M

    budgeted to build one MRI suite in Iowa, against $1.49M for the scanner and its installation.

    SourceIowa Certificate of Need filing, 2026

  3. Run

    100 h

    of unplanned downtime a year at the average Canadian MRI site, 3.5 times its planned maintenance.

    SourceCanada's Drug Agency, imaging inventory 2022–23

“Choosing an MRI and preparing its room takes more than thirty people and hundreds of pages.”

The founder, from his own projects

Where the time goes

The scanner installs in days. The room takes months.

Install the MRI

4–8 days

SourceIPEM et al., MRI planning guidance, 2026

Build its room

13–25 weeks

SourceTexas TDLR project registrations, 2024–26

Drawn to scale at the top of each range.

266–304

pages of one maker's site rules for one MRI

SourceGE HealthCare MR pre-installation documents

2–3 months

lost when planned shielding was not built

SourceIPEM et al. 2026, UK case reports

The physics

An MRI room is a physics problem.

  • 60,000×

    Earth's field, inside a 3 tesla magnet

    SourceNOAA; our arithmetic: 3 T ÷ 50 µT

  • 5 gauss

    Pacemaker line: access-controlled inside

    SourceICNIRP 2009 · IEC 60601-2-33 (2022)

  • Up to 1.5M L

    Helium gas in a quench, piped outdoors

    SourcePace et al. 2019 · GE venting requirements

  • 90 dB

    Shielding cuts radio power a billionfold

    SourceGE RF shielded room requirements

  • 3–8 t

    Magnet weight the floors must carry

    SourceEye of Horus planner profiles, 25 systems

Each limit is set by physics, a standard or the maker's manual. Software can check every one, and flag what is missing.

Plan of the fictional demonstration site with its magnetic field linesScan roomEquipment roomOperator room